No. |
Description
|
Carried
out
|
Not carried
out
|
Not
applicable
|
Comment
|
1 |
Tank main service valve closed and
secured to prevent accidental discharge |
|
|
|
|
2 |
Distribution
valves verified closed |
|
|
|
|
3 |
Check correct function of level
indicator |
|
|
|
|
4 |
Contents of CO2
tank checked by tank level indicator |
|
|
|
|
5 |
Contents of
CO2 tank checked by riser tube reading
|
|
|
|
|
6 |
Contents of CO2
tank checked by level control
valve |
|
|
|
|
7 |
Supports of tank
inspected |
|
|
|
|
8 |
Insulation on tank
inspected |
|
|
|
|
9 |
Safety valves of tank
inspected |
|
|
|
|
10 |
Safety valves of tank
tested |
|
|
|
|
11 |
Contents of pilot cylinders
checked |
|
|
|
|
12 |
Start/stop function of
cooling compressors tested |
|
|
|
|
13 |
All connected electrical alarms and
indicators tested |
|
|
|
|
14 |
Main
manifold valve inspected |
|
|
|
|
15 |
Main manifold valve tested |
|
|
|
|
16 |
Distribution
valves inspected |
|
|
|
|
17 |
Distribution valves tested |
|
|
|
|
18 |
Release stations inspected |
|
|
|
|
19 |
Total flooding
release mechanism inspected |
|
|
|
|
20 |
Total flooding release mechanism
tested |
|
|
|
|
21 |
Time delay devices tested
for correct setting* |
|
|
|
|
22 |
Warning alarms tested |
|
|
|
|
23 |
Fan stop tested* |
|
|
|
|
24 |
Distribution lines and nozzles
inspected |
|
|
|
|
25 |
Distribution lines and
nozzles tested |
|
|
|
|
26 |
Distribution lines and nozzles blown
through |
|
|
|
|
27 |
All doors, hinges and locks
inspected* |
|
|
|
|
28 |
All instruction plates
inspected |
|
|
|
|
29 |
Tank main service valve
reopened and secured open |
|
|
|
|
30 |
System put back in service |
|
|
|
|
31 |
Inspection date
tags attached |
|
|
|
|