Unified Interpretation of SOLAS Regulation II-1/3-5

1426 UI of SOLAS reg. II-1/3-5

Unified Interpretation of SOLAS Regulation II-1/3-5

 

    dd-mm-yyyy = Entry into force
Document MSC.1/Circ.1426 13-06-2012

  1. The Maritime Safety Committee, at its ninetieth session (16 to 25 May 2012), with a view to ensuring a uniform approach towards the application of the provisions of SOLAS regulation II-1/3-5, and following a recommendation made by the Sub-Committee on Ship Design and Equipment, at its fifty-sixth session, approved the annexed unified interpretation concerning the means by which compliance with SOLAS regulation II-1/3-5 is achieved.

  2. In this context, it is recalled that 1 January 2011 was the entry into force date of the amendments to SOLAS regulation II-1/3-5 adopted by resolution MSC.282(86) and the date on which the interpretation of the term "new installation of materials containing asbestos" as contained in MSC.1/Circ.1379 became effective.

  3. Member Governments are urged to implement as soon as possible the annexed interpretation when verifying compliance with SOLAS regulation II-1/3-5 and to bring it to the attention of all parties concerned.

1426 UI of SOLAS reg. II-1/3-5

Interpretation of SOLAS regulation II-1/3-5

  1. Administrations or recognized organizations acting on their behalf should verify that materials which contain asbestos, as prohibited under SOLAS regulation II-1/3-5, are not installed on ships by reviewing asbestos-free declarations and supporting documentation for the structure, machinery, electrical installations and equipment covered by the SOLAS Convention, which should be provided to the Administration or recognized organization by shipyards, repair yards and equipment manufacturers, taking into account appendix 8 of the 2011 Guidelines for the development of the inventory of hazardous materials (resolution MEPC.197(62)).

Interpretation of MSC.1/Circ.1379

  1. The phrase "new installation of materials containing asbestos" in MSC.1/Circ.1379:

    1. means that material used (i.e. repaired, replaced, maintained or added) as a working part of the ship as per the appendix should be documented with an asbestos-free declaration. The Administration or recognized organization should audit this documentation, in consultation with the Company's nominated person responsible to control asbestos-containing material onboard as per the Safety Management System in accordance with the Guidelines for maintenance and monitoring of onboard materials containing asbestos (MSC/Circ.1045), during annual safety construction and safety equipment surveys; and

    2. does not preclude the stowage of material which contains asbestos on board (e.g. spare parts existing on board as of 1 January 2011).

  2. The phrase "should not be permitted to be installed after 1 January 2011 as a working part" in MSC.1/Circ.1379 means that replacement, maintenance or addition of materials which contain asbestos used for the structure, machinery, electrical installations and equipment covered by the SOLAS Convention is prohibited.

 

Appendix Structure and/or equipment

Structure and/or equipment Component
Propeller shafting Packing with low pressure hydraulic piping flange
Packing with casing
Clutch
Brake lining
Synthetic stern tubes
Diesel engine Packing with piping flange
Lagging material for fuel pipe
Lagging material for exhaust pipe
Lagging material turbocharger
Turbine engine Lagging material for casing
Packing with flange of piping and valve for steam line, exhaust line and drain line
Lagging material for piping and valve of steam line,
exhaust line and drain line
Boiler Insulation in combustion chamber
Packing for casing door
Lagging material for exhaust pipe
Gasket for manhole
Gasket for hand hole
Gas shield packing for soot blower and other hole
Packing with flange of piping and valve for steam line, exhaust line, fuel line and drain line
Lagging material for piping and valve of steam line,exhaust line, fuel line and drain line
Exhaust gas economizer Packing for casing door
Packing with manhole
Packing with hand hole
Gas shield packing for soot blower
Packing with flange of piping and valve for steam line, exhaust line, fuel line and drain line
Lagging material for piping and valve of steam line,
exhaust line, fuel line and drain line
Incinerator Packing for casing door
Packing with manhole
Packing with hand hole
Lagging material for exhaust pipe
Auxiliary machinery (pump,
compressor, oil purifier, crane)
Packing for casing door and valve
Gland packing
Brake lining
Heat exchanger Packing with casing
Gland packing for valve
Lagging material and insulation
Valve Gland packing with valve, sheet packing with piping
flange
Gasket with flange of high pressure and/or high
temperature
Pipe, duct Lagging material and insulation
Tank (fuel tank, hot water, tank,
condenser), other equipments
(fuel strainer, lubricant oil
strainer)
Lagging material and insulation
Electric equipment Insulation material
Airborne asbestos Wall, ceiling
Ceiling, floor and wall in
accommodation area
Ceiling, floor, wall
Fire door Packing, construction and insulation of the fire door
Inert gas system Packing for casing, etc.
Air-conditioning system Sheet packing, lagging material for piping and flexible joint
Miscellaneous Ropes
Thermal insulating materials
Fire shields/fire proofing
Space/duct insulation
Electrical cable materials
Brake linings
Floor tiles/deck underlay
Steam/water/vent flange gaskets
Adhesives/mastics/fillers
Sound damping
Moulded plastic products
Sealing putty
Shaft/valve packing
Electrical bulkhead penetration packing
Circuit breaker arc chutes
Pipe hanger inserts
Weld shop protectors/burn covers
Fire-fighting blankets/clothing/equipment
Concrete ballast

Note: The above list is taken from resolution MEPC.197(62), appendix 5, paragraph 2.2.2.1.